Bridge Refurbishment
Bridge Refurbishment
Bridge Refurbishment

Torquay Inner Harbour Pedestrian Foot Bridge and Impounding Gates, shown in the photograph, were completed in 2003.  They were built through contractors, C. Spencer Ltd, for Torquay Council.  Pressure Design was responsible for the design, manufacture and installation of the Hydraulic Control System.  

Established over 25 years ago, Pressure Design has grown into one of the largest independent Electro-Hydraulic control system manufacturers in the country. Our “in house” team of mechanical and electrical engineers look after all projects from initial concept through to design, manufacture, installation and commissioning. We have undertaken several contracts for bridge and dock applications including:

  •         M.G. Bennett & Associates - Pembroke Dock
  •         C. Spencer Ltd - Fraserburgh Ship Lift 
  •         British Waterways - Erskine Swing Bridge
  •         British Waterways - 10A Millennium Link
  •         British Waterways - Grimshaw Lane
  •         ABP - Ipswich Ro-Ro

 

In the listed applications we were responsible for the design, manufacture, installation and commissioning of the hydraulic and electrical control system. 

Enquire Now
Name:

Email:

Tel:

Company:

Our Services Our Services
Test & Repair
Our test and repair facilities incorporate test stands for all valve and pump interfaces...
Distributors Distributors
Complete Service
Through our close association with our distributors, Pressure Design offer a complete service...