Call our TEAM
Latest News
23 July 2018
Pressure Design are available on Facebook, Twitter, LinkedIn and Youtube. Make sure you connect with us! Facebook: https://www.facebook.com/Pres
8 June 2018
We are pleased to have hired William Hamilton after his recent graduation from Southampton University. He will no doubt be a great addition to our pro
Bridge Refurbishment
Bridge Refurbishment
Bridge Refurbishment

The bridge shown in the photograph crosses the harbour entrance channel of the Port of Västerås in Sweden.  It is located between the mainland and the peninsular at the north side of Lake Mälaren. Pressure Design was responsible for the Design, Manufacture, Installation and Commissioning of the Hydraulic Control Systems for this bridge. 

The bridge consists of five spans – three fixed spans and two lift spans.

Both lifting spans have their own 30kW Hydraulic Power Units and each span is lifted and lowered using two hydraulic cylinders.  (220mm Bore, 4m Stroke).

Enquire Now
Name:

Email:

Tel:

Company:

Our Services Our Services
Test & Repair
Our test and repair facilities incorporate test stands for all valve and pump interfaces...
Distributors Distributors
Complete Service
Through our close association with our distributors, Pressure Design offer a complete service...